Home > Buy Now > Paint & Coatings > Building Coating > Anti-alkali Primer
 


Foshan Mingbang Chemical Co.,Ltd
 
icon Paint/Coating

line

icon Company Profile
icon Selling Leads

line

 
Contact us
Foshan Mingbang Chemical Co.,Ltd
[China]
Address:
No.19 Shi Long Da Dao,Xin Tang Industrial Zone,ShiBan,LunJiao section,Shunde,Foshan City,Guangdong Foshan Guangdong 528306 China
Phone:
86-0757-13825516664
Contact name:
Rena Liu , Director
Inquire now










Foshan Mingbang Chemical Co.,Ltd



 
Paint/Coating

Anti-alkali Primer

Inquire now

Anti-alkali Primer

Click to enlarge image

 Origin China
 Adhesion excellent
 Color whole
 Drying Time 2 hours
 Scrubbing Resistance >5000times
 Solid Content >50%
 Storage Period 1 year

Lily-color Series ,alkali primer is completely closed to retain the good features high-quality primer, based on the use of advanced "IPS + (new polymer synthesis process)" technology, a significant reduction in residual odor products. At the same time to effectively infiltrate into the internal wall, providing excellent
Different and better adhesion of the closed nature of the mold also has a good effect. Lily series with the wall paint color products, but also allows you to have a comfortable, clean home environment.
Scope of application: interior walls
Uses: suitable for interior decoration and re-painted.
Dilution:
uniform mixing before use.
In order to achieve the best effect of brushing, roller coating, Brush can be used according to the actual situation of not more than 10% (volume ratio) diluted in water, as appropriate, in accordance with changes in construction of hand).
f you are using airless spraying, according to the actual situation may be the use of not more than 5% (volume ratio) diluted in water.
Painting over a number of recommendations: Lily colors alkali primer closed again
Drying time:
Table Dry: 60 minutes Hard dry: 2 hours Please do not wet or cold weather (temperature below 5 , relative humidity greater than 85%) under construction.
Cleaning Tools:
Half-way stop and paint coating has been completed, please use water to clean all the equipment.
Construction tools: roller coating, Brush or Airless Spray
Chatham theoretical amount of consumption:
Paint the volume of consumption: 11 ~ 12 square meters / L / single-pass (30-micron dry film) of
due to the actual construction of the surface roughness and the dilution ratio is different from the volume of consumption of different paint.
 Re-coating time: interval of at least 4-6 hours (high humidity or temperature is slightly lower, should be extended), but the longest re-painted in a week.
 Note:
  Be sure to carefully read the packaging before use in the construction of that text in order to obtain reliable and satisfied with the results of the coating.
  in the beginning as far as possible before the operation and use of all open windows and doors to ensure that the construction of the regional conditions of adequate ventilation.
  If skin allergies, please always wear in the use of protective equipment; if they contaminated the eye, immediately rinse with plenty of water and seek medical assistance.
  Please do not let children or pets into the construction area, and products placed in reach; that if they inadvertently contaminated, rinse immediately with plenty of water and seek medical assistance.
  When the paint leak when knocked over, covered with sand or soil after the disposal of the collection and reasonable, not to paint into the sewer or drain.
  paint waste to be disposed of in accordance with local environmental standards (please see the product before use Safety Data Sheet).



Inquire now